Sunday, February 10, 2008
Home (Dis)repair
My house is in chaos . . . first I stripped wallpaper in the kitchen & powder room . . . a long, boring, tedious task! Then before I could get the mess cleaned up, my contractor was ready to paint & install my crown molding so he moved everything from the living room to the basement or kitchen. . . more mess! In addition, I was not crazy about the crown molding (too big & fancy) so I asked him to remove it & redo it. After my few attempts to get these areas cleaned up, the contractor came back to install the bathroom, but we encountered some problems there as well. I didn't like the paint I selected with the color of the new hardwood floor. I wasn't sold on the way the contractor wanted to do the walls, and some supplies needed to do the job were on backorder at 84 Lumber. The bathroom was totally torn out when we discovered it could not be installed for a week . . . a little inconvenient as well as creating yet another pile of stuff in the hallway. It's all beginning to be rather overwhelming, & I'm looking forward to having some order restored any time now. By the way the contractor & his two employees have now seen me if every possible attire but we reached a new low last week when I overslept & greeted them in a robe with a towel wrapped around my wet hair.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment